News
22 Sep 2022 - Source: Charlotte Post (Innovation Origins)
Toward a virtuous cycle in construction: 'Get rid of the potato French fry cutter'
Construction in the Netherlands urgently needs to innovate. The housing shortage, meeting sustainability goals, and infrastructure maintenance make transition and innovation necessary. Professor André Dorée, chair of the Civil Engineering & Management Department at the University of Twente, is already involved for 30 years in how the Dutch construction industry - and infrastructure in particular - innovates. "In this, I mainly look at the role of the government," he says. "It fulfills many roles. Among other things, the government is market master, important buyer, licensing authority and enforcer."
21 Jun 2022
Construction sector will be completely overhauled by digitalization
Innovations that go far off the beaten track, that is what 4TU.Bouw, one of the nine Centers of the 4TU.Federation, is dedicated to. The four technical universities and fourteen universities of applied sciences in the Netherlands are working together on a long-term vision and an action plan for (fundamental) research in the construction sector. Clever minds are shining their light on the future of the construction sector, each from their own background and perspective.
21 Jun 2022
De bouw gaat volledig op de schop door digitalisering
Innovaties die verder gaan dan de gebaande paden, Daar zet 4TU.Bouw, een van de negen Centers van de 4TU.Federation, zich voor in. De vier technische universiteiten en veertien hogescholen in Nederland werken samen aan een langetermijnvisie en een actieplan voor (fundamenteel) onderzoek in de bouwsector. Knappe koppen laten hun licht schijnen op de toekomst van de bouwsector, ieder vanuit hun eigen achtergrond en invalshoek.
2 Jun 2022
Internationaal treinverkeer ontspoort zonder goede samenwerking
Steeds vaker ontstaan er kleine scheurtjes in treinrails. Om dit op te lossen is internationale samenwerking cruciaal.
2 Jun 2022
International train traffic will derail in the absence of good cooperation
More and more often, tiny cracks are appearing in train tracks. International cooperation is crucial to solve this.
19 May 2022
`We're only going to succeed with the knowledge of tomorrow'
The world is in transition. This is having a huge impact on all sectors, and that includes construction. Consequently, 4TU.Bouw is committed to jointly developing the knowledge of tomorrow.
19 May 2022
‘Het gaat ons alleen lukken met de kennis van morgen’
De wereld is in transitie. Dat heeft een enorme impact op alle sectoren, waaronder de bouw. 4TU.Bouw zet daarom in op het gezamenlijk ontwikkelen van de kennis van morgen.
11 Jan 2022
'Cooperation starts with a personal click'
After two years of scientific directorhip of 4TU.Built Environment, Maarten Hornikx (TU/e Built Environment) hands over the baton to Max Hendriks (TUD Civil Engineering). Hendriks sees sustainability as one of the most important themes for construction. A common scientific vision is needed, and therefore cooperation between the 4TU and partners in the construction industry. An interview with both of them.
23 Nov 2021
‘Eén gemeenschappelijke aanpak is nodig om innovatie doelmatiger te maken’
Om tot een doelmatige innovatie in de bouwsector te komen, is een gemeenschappelijke aanpak met centrale sturing nodig. Henk Visscher, hoogleraar woningkwaliteit en procesinnovatie aan de TU Delft, startte daarom samen met collega’s van TNO en de bouwbranches het Bouw en Techniek Innovatiecentrum (BTIC). Visscher vertegenwoordigde vanuit zijn rol voor 4TU.Bouw de belangen van de vier technische universiteiten. Nu, zo’n 4 jaar later, krijgt het BTIC een formele rol in de innovatieketen. Voor Henk is het tijd voor een volgende uitdaging.
25 Oct 2021
Operator Feedback Support: digital assistance in training excavator equipment
SOMA College (the biggest construction equipment operator training center in the Netherlands) faced a challenge: how can one instructor observe five or six students at the same time, with each student operating a large machine?
21 Sep 2021
4TU.Built Environment strategy 2022-2025 approved
The 4TU.Federation has approved the 4TU.Built Environment strategy and budget for 2022-2025.
4 May 2021
25 partners uit de bouwwereld ondertekenen Manifest Infra
Meer dan 25 partijen uit de bouwwereld, inclusief 4TU.Bouw, slaan handen ineen voor een innovatieve aanpak van vervanging en renovatie.
19 Mar 2021
De opbrengsten van vier jaar Bouwagenda
4TU.Bouw is nauw betrokken geweest bij de Bouwagenda onder leiding van Bernard Wientjes. Tevens is 4TU.Bouw partner in het samen met het bedrijfsleven opgerichte Bouw en Techniek Innovatie Centrum (BTIC).
11 Jan 2021
‘Samenwerking start met een persoonlijke klik’
Na twee jaar wetenschappelijk directeur te zijn geweest voor 4TU.Built Environment, geeft Maarten Hornikx (TU/e Bouwkunde) het stokje over aan Max Hendriks (TUD Civiele Techniek). Hendriks ziet duurzaamheid als een van de belangrijkste thema's voor de bouw. Een gezamenlijke wetenschappelijke is visie nodig, en daarom ook samenwerking tussen de 4TU en partners in de bouwsector.
22 Jun 2020
Interview with the new Scientific Director of 4TU.Bouw
Maarten Hornikx (TU/e) has been the Scientific Director at the 4TU.Bouw Center for Built Environment since February 2020. He has taken over the role from André Dorée (UT) who will continue his involvement in the centre as one of the four TU ambassadors.
HomeNews